THMS (in the form of THMS) raised beds almost complete

The final design for the THMS raised beds was completed in early December and we had super weather to build and fill the beds by Christmas vacation.  Today was the last day of school and we weathered rain and wind to fill each bed with some soil and we will have plans for planting ready for our spring.  Below is a picture taken from the second floor.

OLYMPUS DIGITAL CAMERAOLYMPUS DIGITAL CAMERA